Fitchburg City Hall
Historical Renovation
The full renovation of Fitchburg’s City Hall called for a range of demolition that included the removal of interior finishes, saw cutting, shoring, and crane work.
The long- awaited renovation of previously unoccupiable building included a full floor structure removal with shoring of exterior walls. Unified collaborated with the project team at Bond Brothers to design a strategic shoring plan which attributed to overall project cost efficiencies.
The complete demo of a concrete vault located in the buildings’ basement was a unique part of the demo scope that was skillfully self-performed by Unified’s in-house Brokk and equipment operators.
Our Environmental Division was subcontracted to perform brick restoration, lead paint removal, and asbestos removal from the roofing system and windows of this 167-year-old historic building.
This project was the recipient of the 2021 Preservation Massachusetts Paul & Nikki Tsongas Award and the CMAA New England Project Achievement Award.
Location
Fitchburg, MA
Client
Bond Brothers
Owner
City of Fitchburg
Architect
ICON Architecture
Project Team
Project Executive: Jim Sullivan
Awards & Recognition
-
2021 Preservation Mass Paul & Niki Tsongas Award
-
2021 CMAA-NE Project Achievement Award

Unified tackles the demolition of a bank vault located in the basement level via electric Brokk.