Amgen Labs  
Cambridge 

The lab renovation at Amgen consisted of a complete demo of the 8th floor laboratory space at 300 Binney Street in Cambridge. The project consisted of a challenging demo scope working within a highly sophisticated lab environment including GWB ceilings and soffits, CMU partitions, epoxy floor grinding, and the torch cutting and removal of sterilizer equipment. Unified took advantage of their useful demo tools, including the use of a Brokk on the CMU partitions and Sherpas for debris handling.

0.jpg
Location
360 Binney Street, Cambridge 

Client
Skanska 

Owner
Amgen Labs 

Architect
Architectural Design Concepts

Project Team
Project Executive: Greg Faria 


Self Perform Scope 
Floor Grinding
Burning/ Torch Cutting
Electric Brokk Demo 


 
IMG_5276-2.jpg
IMG_5297-2.jpg